Client: Boehringer Ingelheim
This 17,000m2 project includes an Ampule and Solids packaging building (APP), which houses QA/QC offices, general offices and multiple packaging lines. The APP Building is linked to a fully automated lights out High-Bay Warehouse (HBW). At 22m high this warehouse is equipped with a European racking system and demands strict tolerances in base building construction. The 3-level Centre of Competence (CoC) houses high quality lab and working offices. Associated works include Hazardous Goods store, Pumphouse and Firefighting Water Tank, Waste, Gate Houses and upgrades to the existing infrastructure including a new 4000KVa substation, underground services, ring road and packing areas.